Bund Integrity Analysis and 3D Survey

BPM was engaged to support our clients bund integrity program across all assets in their Distribution business. This included the assessment of 10+ depots against AS 1940-2017.​ BPM was engaged to perform 3D survey and analysis of all depots, including the procurement (tender, evaluation and award) of the 3D Survey subcontractor.​

A significant aspect of work was the premobilisation / mobilisation administration for site work including:​

  • Detailed travel arrangements for each group of travel​
  • Preparation of integrated execution schedule​
  • Identification and engagement with key stakeholders including Ampol depot contacts​
  • Preparation of SWMS and Work Permits for site works including use of electrical equipment.​

Site survey and analysis was completed for each depot to confirm:​

  • Bund capacities for each tank on site​
  • Crest locus for each tank on each site​
  • Confirmation of separation distances​

Bund wall and floor profiles including spill points and high and low points that may be used for bund drainage purposes.​