Bund Integrity Analysis and 3D Survey
BPM was engaged to support our clients bund integrity program across all assets in their Distribution business. This included the assessment of 10+ depots against AS 1940-2017. BPM was engaged to perform 3D survey and analysis of all depots, including the procurement (tender, evaluation and award) of the 3D Survey subcontractor.
A significant aspect of work was the premobilisation / mobilisation administration for site work including:
- Detailed travel arrangements for each group of travel
- Preparation of integrated execution schedule
- Identification and engagement with key stakeholders including Ampol depot contacts
- Preparation of SWMS and Work Permits for site works including use of electrical equipment.
Site survey and analysis was completed for each depot to confirm:
- Bund capacities for each tank on site
- Crest locus for each tank on each site
- Confirmation of separation distances
Bund wall and floor profiles including spill points and high and low points that may be used for bund drainage purposes.
Ready to discuss your next project?
Get in touch with our team.